This report is the intermediate performance evaluation report (PPER) on the secondary roads project in Niger, implemented in two successive phases, each of which received a separate Bank loan. The UA 2.3 million ADF loan for financing the first phase was approved on 25 August 1983 and became effective 17 months later on 3 July 1985. The UA 4.6 million ADF loan to finance the second phase was approved on 18 June 1986 and became effective within the projected timeframe on 25 June 1987.
Past Evaluations
Date: 12/02/1999
This abbreviated Project Performance Evaluation Report (PPER) concerns the evaluation of the El-Beheira rural development project in Egypt. The project, whose total cost was estimated at UA 32.3 million, was identified and prepared by the FAO Investment Centre (FAO/IC) for ADB. Appraised by Bank experts in 1981, the project was financed with ADB and ADF funds to the tune of UA 10 million and UA 8 million respectively.
Date: 20/11/1997
The Energy Impact Study covered the sixteen projects listed in the Basic Project Data section of this report. The time period covered by them was twenty-four years; loan approval for the earliest project falling within the scope of the mission was granted in 1973 and the completion report for the last was produced in 1997.
Date: 01/11/1997
In response to the directives of ADF VI mid-term review, Management, in 1993 commissioned a study on Bank Group experience in policy-based lending operations for the period 1986-1993. The study was carried out by a team of two consultants.